Design Layout Image

Client: DNO

IRAQ, ZAKHO, TAWKE

GROTH Storage Tank Valves (PVRV & PRV)

Scope of Work:

  • Cleaning and change the spare parts of the PVRV & PRV valves of the Groth.
  • Calibration and Re- Calibration of the Groth valves at site.

  • Work Duration: 2 weeks

    Design Layout Image

    Client: ROO (Sub Contract)

    Basrah, IRAQ

    Scope of Work: 3D Laser Scanning and Modelling Services Taking the required Site Scanning and produce the point cloud to convert the model to LFM AVEVA product, for designer further processing.

    Design Layout Image

    Client: Kar Group

    IRAQ, Khurmala Oilfield

    Nitrogen generator PSA

    Scope of Work:

  • Supply and installation of PSA nitrogen generator, preassembled on a skid, able to generate 200 Nm³/h of nitrogen with a purity of 99, % at 8 barg.
  • Commissioning, start up and Training the client’s technicians.

  • Work Duration: 3 Weeks